Leak detection / Construction Analysis |
|
|
|
Devices used: pipe camera/sewer for pipe tests ø 40-approx. 200 mm, incl. 1 technician hour |
|
240 € |
Devices used: video-endoscopy camera inspection for cavity examinations and pipe tests ø 10-150 mm, incl. 1 technician hour |
|
240 € |
Devices used: audio detection/geophone Audio location to determine if there are leaks in pressurised water pipes and/or an active pest infestation, including positioning, incl. 1 technician hour |
|
235 € |
Devices used: pressure test/leak test for investigating pipeline leakst, incl. 1 technician hour |
from |
210 € |
Use of equipment for small pressure test/ leakage test (domestic water piping) to examine pipe leakage, incl. 1 technician |
|
120 € |
Devices used: trace gas detection for the determination of any existing pipeline leaks and positioning, incl. 1 technician hour |
from |
325 € |
Devices used: UV light detection to investigate possibly existing structure, component, discharge and/or pipeline leaks, incl. 1 technician hour |
|
180 € |
Fluorescent contrast agent flushing optical leak test and tube connection control |
|
65 € |
Devices used: position location/sewer probing using radio detection, incl. 1 technician hour |
|
240 € |
Devices used: infrared camera for the thermographic inspection of components for the determination of building leaks, burst pipes, thermal bridges and energetic object states, incl. 1 technician hour |
|
280 € |
Devices used: electronic moisture raster measurement 22 measurements minimum are mandatory: |
|
220 € |
Proof of construction drying (10 measuring points max.) |
|
|
80 € |
Individual measurements/Additional measurements distances, humidities, temperatures |
per measuring point |
4,85 € |
Devices used: diving specialist |
|
|
280 € |
additional diving hours |
|
|
140 € |
Devices used: measurement of carbon monoxide concentrations in fire damages and after their removal, incl. 1 technician hour |
|
125 € |
|
|
|
|
General services
|
|
|
|
Working hour |
|
|
47 € |
Technician hour |
|
|
66 € |
Protocol /Report preparation hour |
|
|
66 € |
Arrival / departure per km |
|
|
0,90 € |
|
|
|
|
Mould control and odour neutralization
|
Demobilisation cleaning of all wall and ceiling surfaces with ULV sprayer, incl. spore remover Penetrox F |
m² |
min.10m² |
7,80 € |
Demobilisation fogging I, incl. equipment use: steam generator, spore remover Maxox DF |
m³ |
min. 50m³ |
2,60 € |
Mould analysis/Wipe test |
|
|
Price on request |
Odour Neutralisation / Demobilisation via Fogging incl. machine use, steam generator and Dry Odor |
m³ |
min. 50m³ |
2,20 € |
Odour neutralisation with Biofresh |
m² |
min. 50m² |
1 € |
|
|
|
|
Services pipe cleaning / tank cleaning
|
|
|
|
Use of industrial flushing device for pipe cleaning, sludge suction, filter material, surface cleanin, incl. 1 technician hour |
|
180 € |
Devices used: pipe cutter 16-22 mm with different cutter heads to remove pipe blockages (e.g. roots, grease, limescale, solids, etc.), incl. 1 technician hour |
|
230 € |
Use of industrial flushing equipment for tank cleaning, extraction of sludge, filter material incl. 1 technician hour |
|
180 € |
Filter sand change/replacement of filter media |
|
|
Price on request |